Customer Stories

Vertex Data Management Team Cuts EDC System Build Times by Half with Veeva Vault CDMS

The data management team at Vertex has an impressive track record for operational excellence. Vertex’s sites typically enter data within 48 hours of patient visit, and Vertex locks their data—all study data—within 15 to 18 days. Read about their adoption of Veeva Vault CDMS to reduce EDC database build times from 13-14 weeks for early phase studies to under 7.5 weeks today.

Vertex Case Study - CDMS

Vertex no longer authors or provides technical specs for new study builds. Download the whitepaper to learn Veeva combines EDC specs and design into a single step.